SHANGHAI, China – GE Energy signed two contracts worth $38 million Monday to supply equipment and services for two new hydroelectric plants in China.
GE Energy will provide four turbine-generator sets for the new Xi Xia Yuan hydroelectric facility on the Yellow River. The plant is being built by the Yellow River Water & Hydropower Development Corp., and will have an installed capacity of 144 megawatts.
Also, GE Energy will provide two 33-megawatt hydro turbines, generators and related parts to Fujian Jinzaoqiao Hydropower Co. Ltd. for a station to be built on the Jinzao River.
GE Energy, which has a parts production facility in Bangor, plans to ship the generator sets and related parts to the China sites between the end of this year and August 2007.
Comments
comments for this post are closed